"In 2010 all grade levels tested exceeded 90% in reading. Those grade levels tested in math all tested 94% or higher."

Building and Grounds

Downloadable documents

02/3/2012

The energy audit was presented to the Board of Education at the February 2, 2012 meeting.

03/22/2011

A summary of the Indoor Environmental Quality Survey conducted at Westbrook School is available for review.

09/14/2011

This document highlights the district's green cleaning standards.

03/22/2011

A summary of the Indoor Environmental Quality Survey conducted at Lions Park School is available for review.

03/22/2011

A summary of the Indoor Environmental Quality Survey conducted at Lincoln Middle School is available for reiew.

03/22/2011

A summary of the Indoor Environmental Quality Survey conducted at Fairiew School is available for review.

12/6/2010

The following is a summary of the partnership between District 57 and the Mt. Prospect Park District.

12/9/2010

It is the policy of Mount Prospect School District 57 to implement and practice Integrated Pest Management (IPM) procedures to control pests in school buildings and minimize the exposure of students, faculty, and staff to pesticides. An update to this Policy was made in 2006 and is included.